Test Cases
Reviewing AI Tests
The review statuses, the inspector, versioning, and what approval means.
Every AI draft starts as Pending review. Only an approved version of a test can run.
Statuses
| Status | Meaning |
|---|---|
| Pending review | New AI draft or manual test. |
| Approved | A reviewer accepted this version; it runs. |
| Needs review | The test was edited. The new version must be approved again. |
| Rejected | Declined. Never runs. |
| Archived | Retired. Kept because it has run history. |
Inspector
Click a test to open the inspector beside the list. It shows classification (capability, category, priority, route), the AI's confidence, the commit the draft was generated from and last validated against, preconditions, steps, and the expected result. A run gate line states whether this version runs with the approved suite.
Keyboard: j / k next and previous, a approve, r reject, Esc close.
Decisions
| Action | Effect |
|---|---|
| Approve | This version becomes runnable. |
| Reject | The test never runs. |
| Edit | Opens the editor. Saving creates a new version and returns the test to Needs review; earlier versions are kept. |
| Delete | Tests with run history are archived instead; tests that never ran are removed. |
Confidence is the model's own estimate, not a measure of correctness. Read the steps, not the score.
To act on many tests at once, see Organizing tests.