Projects
Managing Projects
Project cards, statuses, and deleting a project.
The Projects page lists every imported repository. Search by project name or repository, and filter by provider.
Card status
| Status | Meaning |
|---|---|
| ready to analyze | No analysis yet. |
| analyzed | Analysis exists; generation is available. |
| generating tests… | A generation is in progress. |
| generated N tests | The last generation created N drafts. |
| generation failed | The reason is shown in the notice line. |
| generation timed out | The generation ran unusually long; start it again. |
Analyze is disabled until the provider is connected. Generate tests is disabled until an analysis exists. Hover a disabled button for the reason.
Delete a project
The trash icon removes the project, all its tests, and its run history. It cannot be undone. CI webhooks added for the project are removed too. Only roles with the delete-projects permission (Admin by default) can do this.