Billing
Usage and Quotas
What consumes AI credits, and how concurrent runs and projects are counted.
| Quota | Counted | Where you see it |
|---|---|---|
| AI credits | Calendar month, pooled across projects. 1 credit ≈ $0.01 of AI usage. | Billing usage meter, Overview plan panel, AI N% chip. |
| Concurrent runs | Runs that are queued or running, per organization. | N slots chip, Overview plan panel. |
| Projects | Imported repositories. | Checked when you import. |
What uses credits
- Analyzing a repository.
- Generating and regenerating tests.
- AI draft in the manual test editor.
Re-analyzing a commit you've already analyzed never spends a credit, even after a ProoflineQA update changes how analysis reads your code: that rebuild is on us, not your quota. Only code that's actually new or changed is billed.
Reviewing, approving, running tests, and CI do not use credits. When the quota is exhausted, generation and analysis stop until the month resets or you change plan. The meter turns red past your plan's warning threshold.
Concurrent runs
A slot is one run, not one test. A dashboard run started while your organization is at the limit is refused. CI runs wait for a free slot and are not dropped. See Running tests.